We use cookies on this site to enhance your user experience.
By clicking any link on this page you are giving your consent for us to set cookies.

Print

AETOS is a National Private Association with institutional and individuals members.

AETOS was an active member nation in the 2012 ITAWorld Tunnel Congress, held in Bangkok from May, the 18th to May, the 23rd. Two members of the AETOS Board participated in the ITA WG Meetings, in WG2 (Research) and WG19 (Conventional Tunneling).

AETOS participated in the BEFIPS meeting (National Tunneling Associations of Belgium, Spain, France, Italy, Portugal and Switzerland), held in Modane (France), visiting the Emergency Gallery in the Frejus Highway Tunnel in October the 17th.

AETOS working groups are currently working on drafting regulations, technical publications and inventories of tunnels. Some groups organized courses with their members for training. At other times, they focus the work in line with the activities that are developing the ITA working groups, for example doing translations of documents, or similar researches.


Inicia Construcciones

Improved Sanitation Network Capacity Abroñigales Basin. Bending Collector B Abroñigal. Lovat EPB TBM. 3,95 m diameter drill. Tunnel Excavation 2,400 m.

Urban Tunnel and Girona Station Phase I. Herrenknecht EPB TBM. 12.16 m diameter drill. Excavation 2.800 m tunnel.

Platform Construction Project and Road Runner High Speed Mediterranean. Section: Murcia-Almeria. Subsection: Sorbas - Barranco de Gafarillos. TBM Herrenknecht double shield, rock. 10.02 m diameter drill. Digging 6,600 m tunnel double tube.

Extension of Line 9 of the Madrid Metro. Tranche specialized 1.Trabajos mine excavation. Tunnel section 7.50 inner x 8,00 m and 540 ml in length ("BELGIAN METHOD").

Euroestudios

Supervision and control of the platform works High Speed Line Madrid-Galicia, Olmedo-Medina-Zamora-Puebla de Sanabria-Ourense-Lubián. Sections: Espiño Tunnel via left and right satellite Espiño. Features:


Control and supervision of construction of the high speed line Madrid - Galicia. Section: Zamora-Lubián. Subsection: Pedralba of Padornelo Praderia-tunnel. Features:


Highway Beasain - Durango. Section: Zumárraga East - Link Urretxu / Legazpi. Features:


Supervision and control of construction of the highway Jammu - Srinagar. Section: Chenani - Nashri. (India), including Patnitop tunnel of 9 km in length. Improvement and expansion from two to four lanes of the highway Jammu - Srinagar, stretch Chenani - Nashri, including a new tunnel of 9 km, which is built along the New Model Austrian. Features:


Supervision of construction of the High Speed Line Vitoria - Bilbao - San Sebastián. Section: Lemoa - Galdakao. Features:


Technical assistance and monitoring of construction of High Speed Line Vitoria-Section: Galdakao - Basauri. Features:


Supervision and control of construction and road rehabilitation Buga - Buenaventura (Colombia). Section: Cisneros - Loboguerrero. Construction supervision. Features:


Supervision and control of construction of the High Speed Line Vitoria-Section: Tolosa. Features:


Supervision and control of construction of the High Speed Line Vitoria - Bilbao - San Sebastián. Section: Legorreta. Features:


Technical assistance and supervision of construction works of the New Basque Railway Network. Section: Galdakao - Basauri. Features:


Technical assistance for the construction of C-25 Transversal Arterial. Section: Vic - Ruidellots de la Selva. Features:


Supervision of the construction of the motorway Orbital Barcelona. Section: Olessa of Montserrat - Viladecavalls. Features:


Metro Construction Project of Donostia - San Sebastián. Section: Lugaritz - La Concha. Features:


Conceptual design of tunnel installations included in the Group 3 runners Structuring Concession Vouchers roads by groups of Colombia. The study includes 28 tunnels with a length between 4,458 and 90 meters.

Tunnels Inspection Zone 2 (Central - Southern) of Spain from the state highway network. Provinces of Segovia, Madrid, Caceres, Toledo, Cuenca, Guadalajara, Murcia, Jaen, Almeria, Granada, Malaga, Seville and Cadiz. The works include the inspection of a total of 136 tunnels which together account for more than 87 km. Among them are 20 tunnels over 1.00 meters and 36 between 500 and 1,000 meters.

Security officials operating in existing tunnels on the State Road Network of Eastern Andalusia. The works include the inspection of a total of 41 tunnels totaling more than 35 miles. Safety Responsible for the operational phase Somport tunnel. This is one of the longest road tunnels in Spain, with 8.6 kilometers.

Drafting the study of alternatives to improve the evacuation and ventilation in the underground network of near Barcelona. The study undertaken by the company includes the tunnels in central Barcelona, Terrassa and Sabadell. In total there are 9 tunnels that together add up to 31.9 km, with lengths between 6,313 and 1,140 meters.

Vias, Corsan Corviam, Copasa

Platform high speed line Madrid-Zaragoza-Barcelona-French border. Section: Nudo de la Trinidad – Montcada. Section 4.75 km high-speed line, which corresponds to a 3 km underground section executed by TBM 11.66 m diameter and thickness of the coating segments 0.45 m, 0.7 km are cut and cover tunnel. The fundamental unit is the execution of a tunnel boring machine and precast concrete segments. Its main dimensions are: - total length: 3,017 m; diameter: 10,40 m. For the implementation uses a brand HERRENKNECHT TBM EPB with an outside diameter of 11.660 mm, equipped with electric drive with maximum torque of 40,695 kNm and maximum thrust of 138,100 kN.

Vías y construcciones, s.a

Platform for High Speed Line Madrid-Galicia. This subsection, of 8.95 km long, runs through the towns of Baños de Molgas, Xunqueira of Ambia, Paderne Allariz, Allariz and Taboadela. It includes the construction of two viaducts, one on Arroyo dos Muiños of 21 m in length, and another on the Arroyo Pazos, with a length of 64 m. In addition, it also highlights the construction of the tunnel I Casares, of 3,490 m.

Vías-nortúnel

Platform for High Speed Line Vitoria-Bilbao-San Sebastian. Section: Durango-Amorebieta/Etxano (Vizcaya). Tranche 4,60 kilometers long. Building Larrinagatxu viaducts, Etxena and Betzuen of 66, 428 and 280 meters long respectively, and those of Bernagoitia I and II, both 36 meters length. Also works include the San Andres tunnels (703 meters), Urzelai (661 m.), Olabarrie I and II (481 and 409 meters respectively) and, between the latter two Olabarrie artificial tunnel, 172 meters in length. The free section is 100m2 tunnels for San Andrés, 95 m2 in the case of Urzelai and 85 m2 for Olabarrie.

Comsa

Metro Ankara: Batikent-Sincan-Torekent Section. 15,360 m Line 3. 11 Stations. Metro Ankara: Kizilay-Cayyolu Section. 16,590 m Line 2. 11 Stations.