We use cookies on this site to enhance your user experience.
By clicking any link on this page you are giving your consent for us to set cookies.

ITA Publication 2019

ITA Publication 2019

15 December 2019

Among the series of publications presented at the WTC in Naples, find the ITAtech report N° 11 on Practical Approach for Controlling Blasting Vibration and Optimizing Advance in Tunneling produced by ITAtech activity Group Excavation.This document introduces some guidelines to help make the best use of drill-and-blast (D&B) – techniques in underground tunneling at vibration sensitive locations.
Strict vibration limits can considerably restrict D&B work, increase cost or even prohibit its use. Good planning of controlled blasting can often accommodate such restrictions.
This document does not cover vibration measurement methods or pre-estimation of allowed vibration levels, but merely describes practical suggestions of how to utilize vibration measurement in D&B pattern design and detonation control.
Second and main target of this document is to introduce a suggestion of global data bypassing format between vibration measurement systems and D&B design programs so that this data would be easily available.

The report can be downloaded from the following link : ITATECH-REPORT-2019_DrillBlast.pdf