Working Group 19: Conventional Tunnelling

Actually, WG 19 is currently working on “Guidelines for the Design and Construction of Conventional Tunnelling in Urban Setting”.
E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Head of Subsurface Engineering
University of Leoben
Erzherzog Johann Strasse 3
AT-8700 Leoben
Austria
Tel: +43 3842 402 3400
Fax: +43 3842 402 6602
Mob: +43 664 210 1607
E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Sandvik Mining and Rock Solutions
P.P. Box 100
33311 Tampere
Tel: +358 40 547 3301
E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Publications