Romania Activity Report PDF
Under construction: Metro Line 5.
Lot 1.2 - Valea Ialomitei Sector (cut and cover tunnel, station and depot) awarded to Max Bögl.
Lot 1.1 – Raul Doamnei – Eroilor (6 km), TBM method tunnels, 9 stations cut and cover method awarded to ASTALDI-FCC-DELTA ACM -AB CONSTRUCT JV.
Both TBM’s in Orizont Station.
Breaking through in Orizont station.
Tunnel performed: TBM 1 = 878 m (started on 21 September 2013) and TBM 2 = 885 m (started on 22 November 2013), between Academia Militara station and Favorit station.
Under construction: Metro Line 4, Section 3, Bazilescu – Straulesti: 2 stations, 1 depot, 2.7 km in length.
Extension of Line 4.
Straulesti depot under construction.
Railway Tunnels under construction:
Turdas Tunnel: 780 m length, double railway, Contractor: a JV leaded by Swietelski;
Danes Tunnel: 969 m length, Contractor: a JV leaded by FCC Construccion;
Sighisoara Tunnel: 400 m length, Contractor: a JV leaded by FCC Construccion.
Hydrotechnical works in progress:
Continuing works to the hydropower development of the river Jiu on the sector Livezeni-Bumbesti includes 2 HPP located in the gorges area, connected by a headrace tunnel having a length of 20 km: concreting of primary and secondary lining along 6 km.
Works on Bistra – Poiana Marului Hydropower System, White River, first water supply tunnel with 2.8-km in length, 2.8-m in diameter.
Works on Surduc-Siriu Hydropower System, Nehoiasu water supply tunnel, 18-km in length (14-km already done), 3.8-m in diameter, concreted on 6-km long.
Works on Brazil (Raul Mare – Retezat) power plant: grouting for under crossing and strengthening in geological faults.
Under designing: Metro Line 6, Metro Link between Central Railway stations “Gara de Nord” and “Henry Coanda” (Otopeni) International Airport.
Feasibility study and Preliminary Design performed by a JV from Padeco (Japan), Metroul SA (Romania) and Oriental Consult (Japan).