Report from meetings:
- 32 attendees from 12 countries
- Both Sunday and Monday meetings
- Clear plan developed for coming year
- Future activities identified
- 6 project reports
- 2 technical presentations
Achievements 2014-2015
-
Owner's guide to immersed tunnels:
- 2nd edition of ITA report no.7 published
-
8 new appendices + glossary of terms
- Drafts for 3rd edition and final edition of ITA report no. 7 weil progressed.
3rdEdition |
|
Fire protection (update) |
Drafted |
Management of immersed tunnel projects |
Drafted |
Tunnel element transportation |
Drafted |
Tunnel element mounted equipment |
Drafted |
Exceptional load cases |
Drafted |
Approach Structures |
Drafted |
Waterstops |
Drafted |
Element construction / Factory method |
Drafted |
Water conditions |
Drafted |
Waterproofing membranes |
Drafted |
Temporary prestressing |
Drafted |
Cathodic protection |
Drafted |
Dredging |
Drafted |
Maintenance and operation |
Drafted |
4thEdition |
|
Durability |
Drafted |
Design standards |
Drafted |
Health & Safety |
Drafted |
Immersion joint seals |
Drafted |
Leakages |
Drafted |
Terminal Joints |
Drafted |
Dualling tunnels |
Drafted |
As-built survey |
|
Overall planning & geometry |
|
Structural form |
|
Spatial planning |
|
Immersion and bouyancy |
|
Post-immersion works |
|
Navigational safety |
|
Contaminated soils |
|
Tolerances |
|
Achievements 2014-2015:
- Environmental paper full draft completed and reviewed by WG
- To be coordinated with WG15
Plan for 2015-2016:
- Environmental paper
- To be published by WTC2016
- SFT Owners Guide
- First draft completed by WTC2016
- Immersed Tunnel Owners Guide (ITA report no.7):
- Publication of 3rd Edition by WTC2016
- Next activities
- Transfer immersed tunnel catalogue to WG20 database
- Construction risk information paper